NO LEGS
Sort By:
Filters:
WIDTH
PANEL MATERIAL
CONNECTION
ASSEMBLED OR KIT
Page {pageNumber} of {pagesNumber}
- A4-2135-0200-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 200MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $186.73 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 200MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $156.73 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 200MM 1/4" POLYCARBONATE, FULLY ASSEMBLED
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $196.18 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 200MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $166.18 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 200MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $151.58 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 200MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $121.58 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 200MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $161.03 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0200-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 200MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 200200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $131.03 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 300MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $194.69 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 300MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $164.69 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 300MM 1/4" POLYCARBONATE, FULLY ASSEMBLED
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $211.13 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 300MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $181.13 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 300MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $159.54 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 300MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $129.54 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 300MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $175.99 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0300-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 300MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 300300 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $145.99 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 450MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $206.63 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 450MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $176.63 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 450MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $233.57 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 450MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $203.57 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 450MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $171.48 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 450MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $141.48 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 450MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $198.42 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0450-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 450MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 450450 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $168.42 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 600MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $218.57 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 600MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $188.57 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 600MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $256.00 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 600MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $226.00 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 600MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $183.42 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 600MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $153.42 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 600MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $220.85 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0600-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 600MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 600600 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $190.85 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 750MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $230.50 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 750MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $200.50 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 750MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $278.44 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 750MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $248.44 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 750MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $195.36 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 750MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $165.36 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 750MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $243.29 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0750-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 750MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 750750 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $213.29 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 900MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $242.44 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 900MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $212.44 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 900MM 1/4" POLYCARBONATE, FULLY ASSEMBLED
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $300.87 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 900MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $270.87 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 900MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $207.30 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 900MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $177.30 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 900MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $265.72 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-0900-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 900MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 900900 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $235.72 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1050MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $254.38 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1050MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $224.38 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1050MM 1/4" POLYCARBONATE, FULLY ASSEMBLED
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $323.30 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1050MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $293.30 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1050MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $219.23 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1050MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $189.23 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1050MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $288.16 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1050-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1050MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 10501050 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $258.16 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-HYMZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1200MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $271.70 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-HYMZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1200MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $241.70 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-HYPZA
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1200MM 1/4" POLYCARBONATE, FULLY ASSEMBLED
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $351.12 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-HYPZK
- SINGLE PANEL-NO LEGS WITH HINGES 2135MM X 1200MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | HINGEHINGE |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $321.12 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-TYMZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1200MM 1" MESH, FULLY ASSEMBLED
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $236.55 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-TYMZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1200MM 1" MESH, AS A KIT
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1" X 1" MESH1" X 1" MESH |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $206.55 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-TYPZA
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1200MM 1/4" POLYCARBONATE, ASSEMBLED
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | ASSEMBLEDASSEMBLED |
- $315.97 / EA
STD LEAD-TIME: 5-7 BUS DAYS
- A4-2135-1200-0150-TYPZK
- SINGLE PANEL-NO LEGS WITH TIE PLATES AND ANGLE 2135MM X 1200MM 1/4" POLYCARBONATE, AS A KIT
- G
- 0
WIDTH: | 12001200 |
PANEL MATERIAL: | 1/4" POLYCARBONATE1/4" POLYCARBONATE |
CONNECTION: | TIE PLATES TOP, ANGLE AT BOTTOMTIE PLATES TOP, ANGLE AT BOTTOM |
ASSEMBLED OR KIT: | KIT (ASSEMBLY REQUIRED)KIT (ASSEMBLY REQUIRED) |
- $285.97 / EA
STD LEAD-TIME: 5-7 BUS DAYS
No items match your selected filters. Please change or reset your filters to try again.
Page {pageNumber} of {pagesNumber}
Loading
Item Added to Cart
View Cart
View Cart
Favorites Updated
View Favorites
View Favorites
This website uses cookies to ensure you get the best user experience. By continuing to use this site, you agree to our
cookies and terms of use policy.